PROJECTS Projects
Data Center and Grid-Scale Battery Storage Projects
GRID CAPITAL develops projects in two fields—data centers and grid-scale battery storage—from site identification through development and operation.
Data Center
DATA CENTERWe are advancing multiple data center projects from location assessment, land acquisition and power-receiving consultations. Due to confidentiality obligations with project operators, details such as location and scale are provided individually.
Starting with available receiving capacity and grid headroom, we handle projects from a few megawatts to large-scale developments, managing everything in-house from securing land through design and construction.
- Location assessment (receiving capacity, grid headroom and disaster risk)
- Land acquisition and rights securing (purchase or lease)
- Power-receiving and grid-connection consultations with utilities
- Consultations with local governments and relevant authorities; permits and approvals
- Design and construction management
Grid-Scale Battery Storage
BATTERY STORAGE- 34projects Projects Handled
- 813MW Total Output
- 3,245MWh Total Capacity
- 17prefectures Regions Covered
GRID CAPITAL has handled 34 grid-scale battery storage projects across 17 prefectures nationwide.
The breakdown is 18 high-voltage and 16 extra-high-voltage projects, totaling 813 MW of output and 3,245 MWh of capacity.
| No. | Location | Grid Category | Output | Capacity |
|---|---|---|---|---|
| 01 | Nagano | High Voltage | 2MW | 8MWh |
| 02 | Yamagata | High Voltage | 2MW | 8MWh |
| 03 | Gifu | High Voltage | 2MW | 8MWh |
| 04 | Tochigi | High Voltage | 2MW | 8MWh |
| 05 | Saitama | High Voltage | 2MW | 8MWh |
| 06 | Iwate | High Voltage | 2MW | 8MWh |
| 07 | Tochigi | High Voltage | 2MW | 5MWh |
| 08 | Tochigi | High Voltage | 2MW | 5MWh |
| 09 | Gifu | High Voltage | 2MW | 8MWh |
| 10 | Gifu | High Voltage | 2MW | 8MWh |
| 11 | Shizuoka | High Voltage | 2MW | 8MWh |
| 12 | Aomori | High Voltage | 2MW | 8MWh |
| 13 | Kumamoto | High Voltage | 2MW | 8MWh |
| 14 | Miyazaki | High Voltage | 2MW | 8MWh |
| 15 | Fukuoka | High Voltage | 2MW | 8MWh |
| 16 | Gifu | High Voltage | 2MW | 8MWh |
| 17 | Shizuoka | High Voltage | 2MW | 8MWh |
| 18 | Wakayama | Extra-High Voltage | 10MW | 40MWh |
| 19 | Tochigi | Extra-High Voltage | 50MW | 200MWh |
| 20 | Miyazaki | Extra-High Voltage | 50MW | 200MWh |
| 21 | Miyazaki | Extra-High Voltage | 30MW | 120MWh |
| 22 | Shizuoka | High Voltage | 2MW | 8MWh |
| 23 | Miyazaki | Extra-High Voltage | 120MW | 480MWh |
| 24 | Fukuoka | Extra-High Voltage | 50MW | 200MWh |
| 25 | Nagasaki | Extra-High Voltage | 50MW | 200MWh |
| 26 | Nagasaki | Extra-High Voltage | 50MW | 200MWh |
| 27 | Fukuoka | Extra-High Voltage | 17MW | 67MWh |
| 28 | Oita | Extra-High Voltage | 50MW | 200MWh |
| 29 | Nagasaki | Extra-High Voltage | 50MW | 200MWh |
| 30 | Kagoshima | Extra-High Voltage | 50MW | 200MWh |
| 31 | Ibaraki | Extra-High Voltage | 50MW | 200MWh |
| 32 | Tochigi | Extra-High Voltage | 50MW | 200MWh |
| 33 | Fukuoka | Extra-High Voltage | 50MW | 200MWh |
| 34 | Chiba | Extra-High Voltage | 50MW | 200MWh |
Project names, detailed locations and operating dates are not disclosed. Please contact us for details.